Sunday, June 3, 2012

One Last Part Arrives



That's it, the end cap for a heat exchanger, the very last part needed for one final project. Finning technician Bryan arrived at 7:45 a.m. on Saturday toting a box of Caterpillar parts and his very heavy tool box down the ramp to the dock.  Why is it always low tide when you have a heavy load? He set to work in a challenging spot in the engine room, a tight space with low headroom. RL assisted while I thoughtfully stayed well out of the way. The left-hand engine is now healthy and runs like it should. Rhapsody is good to go. 

Photo: the new end cap for a Caterpillar 3116 engine
Photo: the old end cap
Major thanks are due to Bryan and to Finning's Parts Dept. for superb customer service. We're a very small customer for a company that handles BIG equipment for major industries, but our needs were met in a very timely manner. 

Saturday, June 2, 2012

The Antenna Project

The big March storms proved too much for our VHF antennas, snapping them both and wiping out our ability to use the VHF radios. We depend on VHF for safety and distress issues, weather reports and general communication so this was a must-do repair project before we could leave the harbor.  Here's a brief look at the effort.

Before...
Photo:Two storm-snapped antennas
Photo:Oops!

During...
Photo:a bit of wire pulling on the upper deck

Photo:a lot of wire inside cabinets, under flooring, etc.
After...
Photo:One antenna connected, one more to go!
Technician Tim from Sea-Com Marine Electronics brought skill, experience and humor to the boat as he and the Capt. installed the antennas and dealt with all of the wiring and connectors. The  VHF radios are functioning again. One more project checked off the list.


Thursday, May 31, 2012

Water Taxi as Nursery


I've written before about our dockside neighbor, Way West Water Taxi, and the colorful people and interesting freight they transport every day. Recently it was the colorful freight that caught my attention. Truckloads of nursery plants were unloaded in the parking lot, wheeled down the ramp in hand trucks or carried by hand. Load after load of pots, flats, hanging baskets and trees began to pile up. This colorful mix stacked along the main dock waiting for a packing wizard to figure out how to fit this large volume of squishable cargo inside a small space. I felt certain it would take more than one workboat to carry that quantity of nursery stock. The main dock was so well decorated that I hoped it would take several days.
Photo: plants hung overhead, filled the seats, aisle and luggage racks
But no, the plants kept disappearing into hatches, into the cabin, into spaces I couldn't see. In no time at all the dock was empty, not one bit of landscaping left. How do you fit truckloads of plants into one workboat??? I went to the Way West website and read about 5000 lb. payloads and large storage capacity, but that still seemed like a lot of nursery stock to fit into one boat. Magic perhaps?


Photo: Dave doesn't look worried, he knows it will all fit... somewhere
Photo: there was plenty of room for plants, passengers, luggage, freight, a driver and a dog